Norman apartments. Construction company "Normann": reviews. Construction companies in St. Petersburg. Normann facilities under construction

14.02.2022 Hypertension

founded in 2004 and performs the functions of a customer, investor, developer and general contractor for residential real estate in St. Petersburg and the region. More than ten years of experience of the company already allows us to speak of it as an experienced builder.

In addition to construction organizations, the Normann Group of Companies includes the management company "Management Company "Norma Dom", the company for the repair and decoration of premises "Remstroyservis", the law firm "Normann-Consult", the information and analytical center "Norminfo". Since 2013, we have been a permanent mortgage partner.

Developer Norman builds economy-class and comfort-class houses, focusing on the needs of the mass market. It happens that houses from the Normann construction company are put into operation with slight delays. The average duration of delays is 5 months, the maximum is 15 months, they report.

December 2015: based on the results of the outgoing year from the volumes of 2014, i.e. The volume of apartments sold remained virtually unchanged.

February 2016: the construction company Normann has taken 9th place in terms of the volume of housing under construction in St. Petersburg and the Leningrad Region. Currently, the developer is working on 300 thousand square meters. meters, a third of which will be commissioned this year. Several new projects will be launched at the same time: two next stages of the Yarkiy residential complex and 2 new residential complexes; Negotiations are underway to purchase new land plots.

April 2018: Norman company posted a notice of its intention to file on the official website se.fedresurs.ru bankruptcy petition their three companies. The developer says that this is primarily a technical measure to stabilize the situation with bankruptcy claims against it from former shareholders.

October 2018: during the 2nd and 3rd quarters of this year, the developer postponed the delivery deadlines for all of its projects except the Normandy residential complex (but delays and postponements are also likely for this). According to some of them, for a year and a half. The question of Norman's real bankruptcy is found in messages on our forum.

December 2018: In 2018, the company continues the construction of 9 residential complexes, several of which have been postponed. The maximum transfer period is 39 months for the Desyatkino residential complex. As the developer promises, apartment buyers should receive the keys to the first phases of the Moroshkino and Yarkny residential complexes by the end of the 4th quarter of 2018. In total, the company's portfolio includes 6 commissioned complexes.

January 2019: according to Fontanka, the general director and co-owner of the Norman Group of Companies, Vladimir Smirnov, was detained the day before in a case of fraud on an especially large scale. Editorial sources report that Vladimir Smirnov was detained as a suspect for two days on January 30. The detention is related to a criminal case, which the Main Investigation Department of the Main Directorate of the Ministry of Internal Affairs opened under Art. 159 of the Criminal Code - fraud on an especially large scale. We are talking about several objects that Norman is building.

June 2019: structures that are part of the Normann Group of Companies are going through the stage of bankruptcy. Many lawsuits have been filed in the courts by defrauded shareholders. In May, the tax service filed a bankruptcy claim against Norman-Service. In April, the company's general director, Vladimir Smirnov, was charged with fraud on an especially large scale. According to investigators, the businessman collected 3.15 billion rubles from shareholders for the construction of the Desyatkino 2.0 residential complex in Murino. Of these funds, only 1.3 billion were spent on work. None of the projects have yet been completed. In total, the company has 8 undelivered residential complexes. It does not carry out construction on sites. And, most likely, according to the forecasts of real estate market analysts, it will officially cease to exist. The authorities of St. Petersburg and the Leningrad region have taken control of the situation with long-term construction. For four complexes - and new contractors have been found. In May, shareholders were announced new deadlines for completing the construction of the complexes.

Construction company "Normann" is a diversified construction holding, one of the leading companies in St. Petersburg and Leningrad region in the field of construction of economy and comfort class housing. Founded in 2004. Carries out the functions of a developer, customer, investor and general contractor. According to data published by the RBC news agency, as of July 1, 2015, Norman ranks 20th among the largest Russian developers in the ranking of the National Association of Housing Developers with a volume of current housing construction of 496,224 square meters. meters.(Source: realty.rbc.ru/articles/29/07/2015/562949996352680.shtml) .

In addition to development structures engaged in the construction and sale of real estate, the holding includes professional organizations offering clients a wide range of services in related areas, including the management company Norma-Dom, the repair and finishing company Remstroyservis, the law firm Norman -Consult”, information and analytical center “Norminfo”. Since 2013, a permanent partner of the developer "Normann" in the field of development mortgage lending is PJSC "Donkhlebbank".

Developer projects

The developer's main projects are concentrated on the border of St. Petersburg and the Leningrad region. These are large-scale residential complexes that combine the most affordable prices for apartments and a decent standard of living for home buyers. The key competitive advantage of the Norman construction company is the current program to reduce construction costs. To achieve optimal performance, the company applies an investment business model, investing in the acquisition of promising land plots, using modern energy-saving technologies and materials, using well-proven architectural and planning solutions and clear financial planning.

Construction quality

The quality of the company's work is highly appreciated among the professional community. At the end of 2014, the developer was among the winners of the regional professional competition"Leader in Construction Quality"(1st and 2nd degree laureate), and was also recognized as the winner of the national competition in the field of real estate, construction and mortgage CREDO in the category “Best developer organization in the multi-storey housing construction market.”

Cooperation with authorities

The construction company "Normann" actively cooperates with St. Petersburg and regional authorities, participating in the implementation of significant social and infrastructure projects. Today, the developer is one of the co-investors in the construction of new exits to the Ring Road in the Devyatkino metro area. As part of business cooperation with the development company Panticapey, Norman was the first construction company to begin developing land plot in the area of ​​the village. Yucca, where a new satellite city of St. Petersburg should appear before 2030 - the complex project “Eurograd” with a total area of ​​​​about 3 million square meters. meters of real estate.

Click on the button below to watch a presentation about the company “12 years with you!”:

To download a booklet with all company objects:

Booklet "All Company Facilities - 2016"

And we know for sure that you and I have room to grow!


The construction company Normann was created in 2004 to implement projects in the field of housing development. Investment and construction group "Normann" is a promising and dynamically developing enterprise operating in the field of housing construction. The Norman company operates in the construction market of St. Petersburg, acting simultaneously as a general contractor, customer and investor.

Normann (“Normann”) builds residential complexes with reasonable savings, which makes it possible to reduce the cost of apartments and make them more affordable.

To date, Norman has built four facilities:

  • Club house "Kolomyagi-Breeze" is a five-story building with 29 apartments, located in Kolomyagi, a historical district in the north of the city;
  • Residential complex “Two Captains”, which consists of two high-rise (20 and 22 floors) brick-monolithic buildings. The complex is located at the intersection of Kuznetsov Avenue and Leninsky Avenue.
  • A 16-storey house built using brick-monolithic technology and located in the Moskovsky district, one of the most prestigious districts of St. Petersburg
  • “Nevskaya Vertical” is a 17-story building located on Vitebsky Prospect, in the prestigious Moskovsky district of the city.

Six more projects of the Norman construction company are in the active design and construction stage:

  • Brick-monolithic houses with 5 floors, located in Vsevolzhsk;
  • Brick-monolithic high-rise residential building “Otslitnik” (22 floors), located on Industrialny Avenue;
  • Located in the village of Shushary, a brick-monolithic 19-storey residential complex;
  • Low-rise cottage community "Normandy", which consists of 267 townhouses and is located in Kolomyaga, a historical district of St. Petersburg;
  • The Izhora Park residential complex planned for construction. According to the project, it will be a composition of five brick-monolithic houses, each of which is planned to have 12–18 levels. The complex will be built in the urban-type settlement Metallostroy;
  • The residential complex “On Zarechnaya” in Pargolovo is at the design stage

Each of the projects created by the Norman company meets the requirements of high-quality and conscientious development, providing the most comfortable living conditions.

The Norman construction company has been operating in the economy class housing construction market since 2004. In her work, she is guided by the postulate that each family should have a separate apartment.

JSC "Normann"

CJSC "Investment and Construction Group Normann" from the day of its formation was part of the SNZK holding. Having increased capacity and gained experience, in 2006 she began to independently engage in real estate development (development). The company builds houses that are affordable for residents with average incomes.

Norman is simultaneously a customer, investor, developer and general contractor. This means that the company carries out the entire construction process, from design and registration of permits to commissioning of objects. In its activities it uses new technologies and developments. The region in which Norman operates is St. Petersburg and the Leningrad region.

Completed houses

  • "Neva vertical"
  • "Vitebsk".
  • "Shushary".
  • "Kolomyagi-Briz", 5-storey building.
  • "Two Captains", 22-storey.
  • "In Vsevolzhsk."
  • "Excellent" on 22 floors.
  • “Izhora-Park” (the second stage has been put into operation, but the apartments have not yet been occupied).

Residential complexes under construction

  • “Desyatkino”, “Desyatkino 2.0” (Vsevolzhsky district).
  • “On Zarechnaya” (Vyborg district of St. Petersburg). Delivery of the 1st stage - 1st quarter. 2016, 2nd-4th quarter. 2017
  • "Three oranges" 1st stage - 4th quarter 2015, 2nd - 1st quarter. 2016
  • "Bright". 1st stage - 1st quarter. 2017

Prospects

At the moment, the residential complexes "Normandy" (Kolomyagi) and "Moroshkino" are being designed. The Norman company plans to become a leader in the construction of economy class apartments in its region. To do this, she plans to work in other areas and provide additional services to customers.

Residential complex "Desyatkino 2.0"

Back in July 2014, I received permission to build the first stage of this Norman housing complex. The construction company Desyatkino 2.0 is building Murino in the St. Petersburg suburb. Two weeks later she began selling apartments to future residents. Permission for the construction of the second stage was received in September of the same year.

Norman is not the only developer of this site. The Three Whales residential complex is being built by SU-155, a construction company as large as Norman. "Desyatkino 2.0" is located within walking distance from the "Devyatkino" metro station. The infrastructure of the microdistrict is expanding. It is planned to equip recreation areas for children and adults.

According to the schedule, the first stage should be commissioned in the second quarter of 2016, the second - in the fourth quarter of 2017. But it is unknown whether the Desyatkino complex will be ready on time. "Norman" delayed the construction progress for three months in the spring.

Residential complex "Izhora-Park"

Norman (the construction company) builds houses not only in open fields. “Izhora-Park” is being built in the historical center of Kolpino. It will consist of five brick monolithic buildings, 12- and 18-story. The first stage (two buildings) has been commissioned, the second stage is due in the 4th quarter. 2015. Price studio apartment- 1.85-2.86 million rubles.

The ceiling height in these houses is 2.7 m. It will make it possible to install furniture and live comfortably. The interior doors in the apartments will be wooden, the entrance doors will be metal.

They plan to use ceramic bricks in the decoration of the façade. Heating will be provided using an autonomous gas boiler room.

Traditional parking is planned. The territory of the complex will be guarded. Each house will have a concierge, and the apartments will have intercoms with the possible installation of video surveillance.

The Rybatskoye metro station is located five kilometers from the construction site. - 70 meters from the construction site.

Major infrastructure facilities are nearby. There are no entertainment facilities yet. Although after the commissioning of the complex they may be located on the first floors, as indicated in the development plan provided by the Norman construction company.

Reviews from residents of the neighboring microdistrict claim that there is a passage under the complex. These places have long been called swamps. Because of this, it is supposedly impossible to build here. But the examination did not confirm these opinions. Buyers hope that the developer has stabilized the soil under the construction site.

The second section was put into operation three weeks later than planned (in January), but occupancy will occur before July 2015, as the construction company Norman assures.

Customer reviews indicate that many people purchase several apartments, especially for resale or rental. They believe that this is a profitable investment.

At the beginning, when the foundation pit is still being dug, the construction company Norman offers relatively low prices for apartments. Customer reviews indicate that it is at this moment that it is profitable to buy an apartment there by paying 100%. Then prices begin to snowball every month. And at the time of delivery they reach the cost of apartments from other developers.

A mortgage can be obtained from a bank owned by the Norman construction company. The bank charges such high interest rates that it is more profitable to take consumer loan. Reviews say that buying an apartment in installments is unprofitable.

With a delay of six months. The employees explain it by the lack of agreement with the authorities on the territory planning project.

Residential complex "On Zarechnaya"

In the second quarter of 2015, the first stage of the complex “On Zarechnaya” should be put into operation. It is also being built by Norman (construction company). Prices are reasonable: a square meter costs from 63 thousand rubles.

The complex in Pargolovo will consist of five residential buildings, the construction of which is carried out in three stages. In December 2014, Norman began building the second phase of the Na Zarechnaya residential complex. It will have two buildings and consist of houses of 19-25 floors, equipped with modern high-speed elevators, metal-plastic windows, and glazed balconies. It is planned to install loggias in the houses of the third stage. The complex will have food and hardware stores, a fitness center, a pharmacy, and office space. They plan to carry out landscaping in the courtyards.

The territory of the housing complex will be protected by a fence. The presence of intercoms will help prevent unauthorized access. A parking lot and open areas will be built for parking. Parnas metro station is 9 km away.

The apartments are planned to be rented out without finishing. The price of a studio with an area of ​​22 m2 is 1 million 35 thousand rubles. The average delay in delivery of objects to the Norman company is 3 months, the maximum is 15 months.

In January 2015, the construction process of the Yarkiy residential complex was launched, which should be completed in 2017.

February 2014: houses, mainly consisting of studios, were received in the Moroshkino residential complex (Vsevolzhsky district). The deadline is the end of September 2016.